Passive Fire Protection at Wychnor Park Country Club

Yee Group carried out extensive refurbishment at the Grade-2 listed Great Hall at Wychnor Park Country Club, operated by Diamond Resorts International®.

The works focused on the extensive refurbishment of the high specification Leisure Centre with its own 25m swimming pool, sauna, steam room, exercise and changing rooms. Yee Group successfully completed their works to the Lobby and Reception of the luxury modernised hall within the allocated 3 weeks enabling the swimming pool to re-open on schedule.

The scope of the works:
Existing doors were replaced with 30-minute fire resistant door, complete with intumescent fire and smoke seals, rebated into the head and jamb of the door frame. Vision panels in 15mm thick laminated safety glass, set in intumescent glazing gaskets, with lipped hardwood glazing beads, were installed. 

Yee Group subsequently completed the full refurbishment of the Centre with the installation of new cubicles and low-energy consumption electrical fittings and systems.

These contracts at Wychnor, with their extensive works and the project management of different trades, illustrate Yee Group’s proven track-record ‘as an experienced contractor working as part of the construction team’. Critically while on site, Yee Group’s plans, minimised noise and disruption, whilst maintaining the programme and the completing works on time and to budget.  
 

About Yee Group

Yee Group’s Fire Stopping Team installs and maintains containment systems in the following built environments:

Social Housing 
High Occupancy Buildings:
High and Low Rise Housing
Residential and Care Homes
Education & Healthcare
Commercial and Industrial Premises

Our team hold FIRAS accreditations for the installation and maintenance of the following:
Penetration Sealing Systems 
• Intumescent Sealants
• Sealing Movement Joints
• Intumescent Sealing Bags

Click this link for more information about Passive Fire Protection

Or for a free survey and quote Contact Us